Removing 5000 Cubic Yards of Sediment
Removing 5,000 Cubic Yards of Sediment
In 2010, after 5 years of preparation and fundraising, the channel was dredged, removing approx 5000 cubic yards of sediment.
1/30/2010 preparation of road on the marsh along the channel looking South
1/30/2010 preparation of road on the marsh along the channel looking South
1-30-2010 preparation of the road accross the marsh from the channel north to the snowmoblie trail
1-30-2010 preparation of the dewatering site just off the snowmobile trail
prepration of the road accross the marsh just South of the snowmobile trail
2/1/2010 mats to create the road accross the marsh staged along the highway
2/1/2010 sections of mat are 4' wide by 18' long
2/1/2010 mats heading to the marsh
2-2-2010 temporary road accrross the marsh looking toward the channel
2-2-2010 survey stakes installed to use for measuring sediment removal
2-2-2010 temporary road accross marsh looking toward snowmobile trail
2-2-2010 temporary road running along channel toward boat landing
2-2-2010 more work being done on temporary dewatering site
2-3-2010 This guy loves his job except when the ice cracks.
2-3-2010 Setting the roadway onto the ice at the south end of the channel.
2-3-2010 Another load of mats to set.
2-3-2010 Setting a mat in place.
2-4-2010 Both ends of the channel have been barricaded.
2-4-2010 More preparation of the dewatering site.
2-5-2010 Sediment in the dewatering site.
2-5-2010 Sediment removal has begun.
2-5-2010 What else will we dig up?
2-5-2010 A load of sediment going into the dewatering site.
2-5-2010 Loading sediment.
2-6-2010 Recording channel depth after dredging.
2-6-2010 More sediment removal.
2-8-2010 Dredging progresses.
2-8-2010 Dredging progresses.
2-8-2010 Dredging progresses.
2-8-2010 Dredging progresses.
2-8-2010 Dredging progresses.
2-8-2010 Dredging progresses.
2-11-2010 A barge being moved to the South end of the channel.
2-11-2010 The dewatering site is filling up with sediment.
2-11-2010 Preparing the barge for the backhoe.
2-11-2010 Moving ice so the barge can be positioned to work on the South end of the channel.
2-17-2010 Piling used to hold barge in place while dredging.
2-18-2010 Part of your hard working association crew.
2-18-2010 The dewatering pit is full of what was once in the channel.